Greenstone Inn: Get'n Skinned and Juiced

With the building full of Plumbers, Electricians Insulators and Sheet Rockers our main crew turned to applying the Greenstone’s skin: beveled cedar siding and cedar shingles. Mid week the PUD crew returned for more pole shuffling and final hook up Cedar trim and beveled cedar siding inch their way down the South wall. It’s good to see real wood being used. Shingling the main Gable End. More shingling along the South wall. A semi load of wall board arrives and is boomed up to the third story. The gas fireplaces are being installed. L. C. PUD returned and pulled the wires from the new building to the new pole. After splice vaults were set they tied it all together. A PUD workman feeds the first of two runs into the conduit on the Greenstone’s side of the street. Here the wire emerges on the pole side of the street. Finally hooked up, the Greenstone is ready for “juice.” Elsewhere, another level gets framed in the stair tower.