Greenstone Inn: Doin' it in the Road...

The main show this week was in the street. W.W. Construction tore up the road and laid the water line and several conduits for power, cable, internet, etc. Meanwhile framing rolled on above. The week started with excavators in the street and second story walls going up. Gluing up the pipes on one end and trenching on the other. Installing the new coupler into the city water main was the feature show (above), followed by backfilling and finally patching the asphalt (below). Storm drain vault some 10’ below street level. Setting the man hole cap on the vault. The waste water heat recoverery coils being installed in the garage. Meanwhile, second story framing continued, despite off and on poor weather. Third story Floor Joist going in. Movin’ right along!