It was a busy Site this week. They formed and poured two floor slabs and several small pours around the structure. The Framing crew completed the floor diaphragm and cantilevered decks. It was a busy place this week with concrete going in (upper right), framers build the floor (center) and one fellow (barely visible on the Sky Trak) working on the deck framing. All the re-bar in the concrete floor slab is visible here, awaiting its mud. Two guys pour while one floats the floor slab of the entry deck which pitches in several direction for drainage. Pressure treated wood is used to build the cantilevered decks which have a slight slope for drainage. With the sheathing being done guard rails on the west end were the order of the day.