Greenstone Inn: Even More Walls and Pads

With most of the perimeter concrete work done, the crew turned their attention to the interior conc. work and other infrastructure. Forming the N.W. corner. The West wall being filled in. Forming done, it's time for concrete. Wall in-fill poured! More pads formed, and ditching for the plumbing rough-in begun.. And, the last few bit of the walls gets formed. Column forms being placed.Plumbing rough-in begins for the heat recovering waste lines which are state-of-the-art energy conservation technology. Footing drains, gravel and filter fabric get placed Backfilling the foundation.. The Elevator shaft moves forward..